Galvanized H Frame Scaffold with Integrated Ladder and EN 12811 / BS 1139 Standard for Construction
| Outer Tube Diameter: | 60/48mm, 56/48mm, 48/40mm | Length: | 2 Meters |
| Structure: | Portal Frame | Weight: | 5 Kg |
| Internal Support: | 2 Longitudinal Bars Cross Braces | Finish: | Galvanized |
| Material: | Steel | Setup Mechanism: | Locking Pin And Threaded Collar |
| High Light: | Galvanized H Frame Scaffold,EN 12811 / BS 1139 Standard Scaffolding Frame,Integrated Ladder Mobile Scaffold Set |
||
The Construction Scaffolding Frame System is a modular temporary support structure designed for commercial and residential projects. This H-frame scaffold set provides a stable working platform for tasks like masonry and facade painting. Its robust design ensures safety while remaining lightweight for rapid manual assembly on-site.
This system features heavy-duty steel construction and standardized modular dimensions. The H-frame design allows for easy vertical stacking, while walk-through access improves worker mobility. Each component is engineered for a precise fit, minimizing sway and supporting significant vertical and lateral loads.
We use high-frequency welding to fabricate our scaffold frames, ensuring strong joints. Surface treatments include hot-dip galvanization or electrostatic powder coating. This technology provides exceptional resistance to rust, significantly extending the equipment's life in harsh outdoor environments.
The system distributes loads through vertical standards stabilized by diagonal cross braces. Gravity loads transfer through the frames to the base, while diagonal braces prevent buckling. Locking pins secure the joints, ensuring the entire assembly acts as a cohesive unit.
- Exterior masonry and facade renovation
- Interior ceiling and electrical maintenance
- Shipbuilding and industrial facility repairs
- Temporary towers for event staging
- Bridge construction and reinforcement
| Component | Material | Specification (mm) | Surface Treatment |
|---|---|---|---|
| Main Frame | Q235 Steel | 1219 x 1930 / 914 x 1700 | Galvanized / Painted |
| Cross Brace | Q195 Steel | 1829 x 1219 / 2133 x 1219 | Galvanized / Zinc |
| Steel Plank | Galvanized Steel | 1829 x 400 / 480 | Pre-galvanized |
| Coupling Pin | Q235 Steel | Dia 35 x 210 / 225 | Zinc Plated |
Our system offers rapid installation, erecting up to 50% faster than traditional methods. Its reusable nature and high durability lower total ownership costs. Safety features like non-slip steel planks and secure locking mechanisms ensure compliance with international regulations.
We provide technical consultation and custom scaffold design. Our logistics team ensures timely global shipping, and we offer installation guidance for large projects. Every batch includes a quality inspection report and material test certificate.
Our process includes raw material inspection, automated cutting, and robotic welding. Frames undergo surface treatment and load testing before shipment.
- Set base jacks
- Place frames onto jacks and connect with braces
- Install steel planks
- Stack levels using coupling pins
- Secure guardrails
- Wear PPE on scaffolding
- Never exceed load capacity
- Keep the scaffold plumb
- Inspect components before use
- Avoid use during extreme winds
As a leading scaffolding provider, we prioritize quality and innovation. Our factory uses automated production lines for consistent precision. With global market experience, we deliver reliable and safe systems that elevate project performance.
